Jump Main Menu. Go directly to the main content (Acces key S)

Sección de idiomas

Fin de la sección de idiomas

Sección de utilidades

Fin de la sección de utilidades

MCH Método Constructivo HabitacionalTime and costs

Start of main content

Time and costs

The serial production of the housing is the main way to achieve cost savings of up to 20% compared to conventional production.

Our engineering excellence in manufacturing and assembly feed into top performance at optimised costs, shortening construction time by up to 50% compared to traditional methods.

End of main content